How to Switch FBA Prep Centers Without a Stockout

A day-by-day 14-day migration plan with email templates and handoff checklists for moving to a new FBA prep center without a stockout.

StepsFrom this piece
  1. Signed agreement with new prep center
  2. Insurance details requested and reviewed
  3. SKU list and pack-out specs confirmed with new prep center
  4. Inventory position documented from Seller Central

Excerpt. The full list is in the piece below.

Leaves: Steps

The single biggest reason Amazon sellers stay with a bad prep center is the fear of switching. Every switch carries real risk of a stockout, a BSR collapse, or inventory getting stuck in the old provider’s warehouse while they take 30 to 90 days to release it.

None of those have to happen if the switch is planned. This is a day-by-day plan. It works the same way for a 500-unit-per-month seller and a much larger account.

Before day one: the prerequisites

You cannot run a clean migration without three pieces in place. If any of these are missing, fix them first.

1. You have a working FBA inbound plan for the next 30 days. If you are about to stockout on your hero SKU next week, now is the wrong time to switch. Switch AFTER the next inbound cycle, not during.

2. You have your current inventory position documented. Pull your Seller Central inventory report. Note: what is at FC (active), what is in-transit, what is at the old prep center’s dock, what is in long-term storage.

3. You have a signed agreement with the new prep center. Switching goes much faster when the agreement is done, insurance details are exchanged, and the new prep center already has your SKU list. Do not start the switch conversation with your old provider until the new side is ready.

At KL Packaging, we aim to send a written quote within one business day, and scope and terms are confirmed in writing before your first shipment arrives.

Day 0: The departure email to your old provider

Most sellers agonize over the departure email. Do not. Short, direct, and paper-trailed is the right move.

Template:

Hi [Account Manager],

We are moving our prep operations effective [date two business days out]. Please consider this written notice of termination per our agreement.

Three asks:

  1. Please confirm receipt of this notice and your expected timeline to release my remaining inventory
  2. Please pause any inbound from my suppliers and ASN’d freight. My new prep partner will provide updated routing
  3. Please send me a current inventory count by SKU and location within your facility by end of business tomorrow

I appreciate everything and wish you well. Thanks for the collaboration.

Best, [Name]

Send this in writing (email), not on a phone call. You want the paper trail. Do not explain why you are leaving. Do not leave room for “let me talk to my manager about discounts.” You have already decided.

If your current agreement has an exit notice period, reference it. You still send the notice now so the clock starts.

Days 1-2: Inventory coordination

The old provider owes you a SKU-by-SKU inventory count. Ask for it within 24 hours, in writing.

Once you have the count, the new prep center needs three things from you to plan the receiving:

  1. SKU list with case pack quantities (how many units per carton)
  2. Expected inbound freight type (LTL, full pallet, or small parcel) and approximate arrival date
  3. Pack-out spec for each SKU (FNSKU? polybag? bundling? dangerous goods?)

At KL Packaging we can take this data in a Google Sheet. We do not require you to fill out an intake form with 40 fields. Email is fine.

The goal in days 1-2 is to have the new prep center ready to receive the exact inventory that is coming, with pack-out specs agreed before the freight arrives. That avoids the dock delay that happens when a prep center figures out a new client’s SKUs on the fly.

Days 2-3: The two-shipment window

The key to a clean switch is running two parallel shipments. While the old provider is shipping out the last of your prepped inventory to FCs, the new provider is receiving and prepping the next batch.

Phase A: Old provider ships out your existing pre-prepped inventory. This shipment is already paid for and already on their dock. They should get it out the door within 48 hours of your departure notice. If they stall, ask for a specific ship date in writing.

Phase B: New provider receives your next inbound freight. This is the shipment that was scheduled to go to your old provider. You redirect it with an updated BOL (bill of lading) or ASN (advance shipment notification). If the freight is mid-transit, the carrier can re-route to the new destination for a small fee.

Run both shipments at once. Your FC never has a gap.

Day 3: The physical inventory transfer

If you have inventory physically sitting at the old provider’s dock that has not been prepped and shipped yet, you have two options for getting it to the new prep center.

Option A: Let the old provider ship it to Amazon FCs as originally planned. Cleanest option. They prep and ship the last batch, send you the final invoice, and the relationship closes. Works if their prep quality is acceptable for the remaining inventory.

Option B: Physically move the inventory from old provider to new provider. More complex but sometimes necessary (for example, if the old provider’s prep quality is why you are leaving). You arrange an LTL pickup from old provider’s dock to new provider’s dock. Cost depends on pallet count and distance, so get an LTL quote before you commit.

Either way, the key is getting the written inventory count in days 1-2 so you can dispatch an LTL carrier without ambiguity.

Days 4-5: First outbound from the new provider

By day four or five, the new prep center has received the inbound shipment, prepped it to spec, and is ready to hand off to FC. Your first outbound from the new provider goes out on Amazon Partnered Carrier or your preferred LTL partner.

The first shipment is a small stress test. Watch for:

  • Did the inbound get received within the window you agreed on?
  • Were FNSKU labels applied correctly? (Pull a random sample and scan)
  • Were any dangerous-goods SKUs handled to Amazon’s rules?
  • Was the invoice on rate card with no surprise line items?

If any of those come back wrong, flag it immediately. A good prep center fixes it before shipment number two.

Ask your new prep center to walk you through the first shipment, on-site or on a video call.

Days 5-10: Settle-in period

The next five business days are about rhythm, not disruption. Your new prep partner is processing inbound shipments on standard cadence, outbound to FC is running, and your inventory position at Amazon is stable or growing.

Watch the BSR on your hero SKUs. A clean migration has zero BSR drop. If you see a drop, trace it back: was there a gap in FC receipt, or was the drop unrelated to the switch?

Start the monthly cadence:

  • Day 7: First check-in with your new prep center
  • Day 14: Compare received counts against what you sent
  • Day 21: First month’s invoice arrives. Review line by line against your quote.

Day 10-14: Close out the old provider

By day 10 your old provider has shipped out your last remaining inventory (or you have moved it physically). They will send a final invoice. Pay it. Request confirmation that your account is closed and all inventory is released.

If the plan held, at this point you have:

  • Switched prep centers in 10 to 14 business days end to end
  • No gap in FC inventory
  • A paper trail of the transition for your records
  • A new rate sheet you can share with your CPA and your bookkeeper

The things that go wrong

Three things tend to derail a switch.

1. Old provider holds inventory past the exit notice. Rare but real. The fix is a written notice referencing your agreement’s exit clause, followed by a letter from your attorney if needed. UCC §7-209 governs warehouse liens, so ask for any claimed charges in writing.

2. New prep center fails the first outbound. The fix is to agree in writing, before the switch, how first-outbound errors get handled.

3. Inbound freight gets stuck between providers. Your inbound freight was going to the old address. You redirected it. The carrier lost the new address. Fix: ALWAYS work with the carrier directly to update the BOL, not through the old prep center.

The switching checklist

Copy this and work through it in order:

  1. Signed agreement with new prep center
  2. Insurance details requested and reviewed
  3. SKU list and pack-out specs confirmed with new prep center
  4. Inventory position documented from Seller Central
  5. Departure email sent to old provider
  6. Old provider’s inventory count received and reviewed
  7. SKU list, case packs, and pack-out specs sent to new prep center
  8. Inbound freight rerouted to new address
  9. Old provider confirms last-outbound ship date
  10. First new-provider inbound received within the agreed window
  11. First new-provider outbound to FC completed
  12. Old provider releases remaining inventory (or it ships out)
  13. Final old-provider invoice paid
  14. Account closed confirmation from old provider

If you are planning a switch, contact us and we will walk through the plan with you. No email gate.

Last updated: October 22, 2026

Trevor Lee

Owner, KL Packaging · Medford, Oregon

Trevor owns KL Packaging in Medford, Oregon. Questions about anything in this piece go straight to him.

Trevor’s profile Ask a question

Next step

Planning a move to a new prep center? Ask Trevor.

A written quote from the owner, not a sales rep. We aim to reply within one business day. If we are not the right shop for what you need, Trevor will tell you that too.

Your paper trail

  1. 01Steps
  2. 02Written quote
  3. 03Reading list

What comes back

  • A reply from Trevor about moving to a new prep center
  • A written quote if you want one
  • Calendar link or a one-page reply
Reviewed by
Trevor Lee, owner
Reply
We aim to reply within one business day.
How you reach us
Direct email + cell